BERKS METAL WORKS LLC
STEEL ESTIMATION
STEEL DETAILING
STRUCTURAL FABRICATION
STRUCTURAL ERECTION
JOIST REINFORCING + ROOF FRAMES
STAINLESS, ALUMINUM, AND STEEL RAILINGS
STAIRS, PLATFORMS, AND LADDERS
SAW CUTTING, HOLE/SLOT PUNCHING
METAL FABRICATION
Chickie’s & Pete’s – Keg Stair
Berks Metal Works designed, fabricated, and installed this painted steel stair and keg slide in the basement of the original Chickie’s and Pete’s on Robbins Avenue. This new stair is wider than the original wooden stair and includes an added grabrail for increased safety.
Busch Vacuum Solutions – Canopy
Berks Metal Works fabricated and installed the structural support system and installed the prefabricated aluminum canopy over the storefront at the Busch Vacuum Solutions building on the Boulevard of the Generals in Norristown, PA.
Allentown Tower 6 – Railing
Berks Metal Works fabricated and installed this steel railing in front of the Tower 6 office building in downtown Allentown, PA
Met Ed Stair assemblies
Berks Metal Works worked along side The Fab Shop to design, fabricate and install (19) powder coated steel stair assemblies in Pennsylvania, Ohio, West Virginia, and Maryland.
The stairs will be used as part of Met-Ed’s confined space training program.
Staples Springfield Roof Railing
Berks Metal Works fabricated and installed this galvanized steel roof rail for fall protection at the Staples in Springfield, PA
15′-0″ L Section
60′-0″ Section
3100 Alburtis Railing
After a trailer damaged this railing, Berks Metal Works fabricated and installed a brand new railing in Macungie, PA
Comcast Platform
Berks Metal Works designed, fabricated, and installed this galvanized steel grating platform for Comcast of Harrisburg.
OSJL Shillington
Berks Metal Works fabricated and installed this caged ladder at the Ocean State Job Lot in Shillington, PA. In addition to fabricating and installing (13) roof top unit frames, and (2) overhead door frames
Lynnewood Elementary SS Railing
Berks Metal Works fabricated and installed over 75′-0″ of polished stainless handrail at the Lynnewood Elementary School.
Stair rail
Marple Newtown Athletic Field Railing
Berks Metal Works fabricated and installed over 400′-0″ of powder coated aluminum picket rail and 2 line rail at the Marple Newtown Athletic Fields for the Marple Newtown School District.
Ramp Section
Entrance
Bulk Chemical Platform
Berks Metal Works fabricated and installed this multi level grating platform with multiple ship’s ladders at the Bulk Chemical plant in Shartleville, PA to provide them with access to their industrial tanks.
Finished Picture
Progress Picture