BERKS METAL WORKS LLC

STEEL ESTIMATION

STEEL DETAILING

STRUCTURAL FABRICATION

STRUCTURAL ERECTION

JOIST REINFORCING + ROOF FRAMES

STAINLESS, ALUMINUM, AND STEEL RAILINGS

STAIRS, PLATFORMS, AND LADDERS

SAW CUTTING, HOLE/SLOT PUNCHING

METAL FABRICATION

Chickie’s & Pete’s – Keg Stair

Berks Metal Works designed, fabricated, and installed this painted steel stair and keg slide in the basement of the original Chickie’s and Pete’s on Robbins Avenue. This new stair is wider than the original wooden stair and includes an added grabrail for increased safety.

Busch Vacuum Solutions – Canopy

Berks Metal Works fabricated and installed the structural support system and installed the prefabricated aluminum canopy over the storefront at the Busch Vacuum Solutions building on the Boulevard of the Generals in Norristown, PA. 

Allentown Tower 6 – Railing

Berks Metal Works fabricated and installed this steel railing in front of the Tower 6 office building in downtown Allentown, PA

Met Ed Stair assemblies

Berks Metal Works worked along side The Fab Shop to design, fabricate and install (19) powder coated steel stair assemblies in Pennsylvania, Ohio, West Virginia, and Maryland.

The stairs will be used as part of Met-Ed’s confined space training program. 

Staples Springfield Roof Railing

Berks Metal Works fabricated and installed this galvanized steel roof rail for fall protection at the Staples in Springfield, PA

15′-0″ L Section

60′-0″ Section

3100 Alburtis Railing

After a trailer damaged this railing, Berks Metal Works fabricated and installed a brand new railing in Macungie, PA

Comcast Platform

Berks Metal Works designed, fabricated, and installed this galvanized steel grating platform for Comcast of Harrisburg.

OSJL Shillington

Berks Metal Works fabricated and installed this caged ladder at the Ocean State Job Lot in Shillington, PA. In addition to fabricating and installing (13) roof top unit frames, and (2) overhead door frames

Lynnewood Elementary SS Railing

Berks Metal Works fabricated and installed over 75′-0″ of polished stainless handrail at the Lynnewood Elementary School.

Stair rail

Marple Newtown Athletic Field Railing

Berks Metal Works fabricated and installed over 400′-0″ of powder coated aluminum picket rail and 2 line rail at the Marple Newtown Athletic Fields for the Marple Newtown School District. 

Ramp Section

Entrance

Bulk Chemical Platform

Berks Metal Works fabricated and installed this multi level grating platform with multiple ship’s ladders at the Bulk Chemical plant in Shartleville, PA to provide them with access to their industrial tanks.

Finished Picture

Progress Picture